(Our Tech Blog) The stadium is located in Taiwan are utilizing solar energy to generate electricity in the stadium listrik.All parts requirement is 100% of the PLTS (solar power).

The roof area of ??14,155 square meters was used for penempatn 8844 solar panels, and enough to provide electricity for lights 3300 and 2 giant screens.

The stadium has been used in 2009 for use on the world sporting celebration, where the branches of sports that are not accommodated by the Olympics will be contested here.

The stadium is able to produce 1.14 million KWh of electricity and is able to prevent the release of 660 tons of carbon dioxide into the atmosphere each year. At the stadium is not in use, electrical energy is used as a backup electrical energy to be channeled to the city power grid when needed.

The roof area of ??14,155 square meters was used for penempatn 8844 solar panels, and enough to provide electricity for lights 3300 and 2 giant screens.
The stadium has been used in 2009 for use on the world sporting celebration, where the branches of sports that are not accommodated by the Olympics will be contested here.
The stadium is able to produce 1.14 million KWh of electricity and is able to prevent the release of 660 tons of carbon dioxide into the atmosphere each year. At the stadium is not in use, electrical energy is used as a backup electrical energy to be channeled to the city power grid when needed.
source: http://www.klikunic.com/2011/09/stadion-dengan-listrik-100-dari-plts.html